STRAND
STRANDDOCS
Autonomous Construction Intelligence
User Guide & Workflows

How to Use STRAND

Step-by-step practical guides for engineers, commissioning agents, and project managers using STRAND on hyperscale construction projects.

1. Auditing Vendor Submittals (Guardian Agent)

Zero-Hallucination Spec Compliance

When a contractor or vendor submits equipment cut-sheets (e.g. chillers, generators, UPS systems), Guardian reads the PDF, extracts operating parameters, and checks them against ingested project specifications.

AUpload Vendor Cut-Sheet PDF

Navigate to the Guardian tab in the web console. Drag and drop the vendor PDF submittal.

BAutomated Parameter Audit & Spec-DNA Hashing

Guardian extracts key specs (e.g. ambient temperature = 45°C) and compares against the project basis (TIA-942-B requirement = 50°C).

CInstant RFI Generation & R₀ Impact

If a deviation is found, Guardian flags the violation, computes the R₀ contagion score, and prepares a formal RFI draft for human sign-off.

2. Monitoring Critical Path Risk (Scheduler Agent)

Dynamic Delay Containment

The Scheduler Agent continuously monitors the 100+ task master schedule graph, identifying which milestones are at risk of cascading delay.

High R₀ Alerts (R₀ ≥ 2.0)

Indicates super-spreader delay risks that will infect critical milestone dates (e.g. Energization, Ready for Service).

Recommended Mitigations

Provides actionable schedule compressions: fast-tracking pre-commissioning, parallel cable pulls, or dual-sourcing.

3. Field Voice Commissioning (Inspector Agent)

Offline-First Mobile QA

Field commissioning engineers on-site use the React Native mobile app or web console to execute Level 1 through Level 5 commissioning checklists.

Voice NCR Ingestion: Speak observations directly (e.g. "Generator fuel day tank valve failed pressure test at 3.5 bar").
Offline Edge Resilience: If connectivity drops in the data hall, observations are cached locally and synchronized when reconnecting.
As-Built Generation: Upon checklist completion, STRAND automatically compiles a formal As-Built markdown and PDF record.

4. Project Intelligence Queries (Brain Agent)

Grounded Multi-Modal QA

Ask complex engineering questions across all ingested tender documents, submittals, RFIs, and NCRs:

// Sample Brain Questions
> "What fire suppression system is required for UPS rooms exceeding 500 kVA?"
> "Which open NCRs currently threaten the Substation Energization milestone?"